Was this done to encourage pole-ish jokes? Where was the building inspector? Where was the electrical inspector?

While disaster plans must primarily address preventing loss of lives during the initial phase of the disaster, they must also address the post-initial phase (disaster recovery) with electrical equipment.

Arc-fault circuit interrupters (AFCIs) have become a familiar technology to electrical contractors during the past decade.