In Canada, which loads of an electrical system in a health care facility are considered to be essential system loads per the CE Code?

In most areas of the country, building construction is booming, and there is a huge need for and use of temporary construction power.

This article is a continuation of what I see as significant changes that are coming in the 2007 revision of the National Electrical Safety Code.