The U.S. Department of Energy’s Advanced Building Construction Initiative will help ensure that ongoing innovation in the construction industry incorporates energy-efficiency technologies.

Please provide an update on where I can easily find wire connectors that are Listed (Certified) for splicing or tapping conductors on the line side of service equipment as required in the National Electrical Code® (NEC®) 230.46.

Collaboration is a key aspect of successful project execution to ensure the successful completion of projects on time and within budget.

The transportation system of tomorrow will be substantially different from the system that most Canadians are familiar with today.

Shared knowledge and collaboration between everyone involved will derive stories of electrical safety achievements that people wish to tell through the end of time.

Connecting a utility-interactive PV power system can be accomplished on either the supply side or the load side of the facility’s main service disconnect.

By allowing more options, AFCI technology will evolve, adoption will increase, and ultimately people will be safer.

A product that is either factory-certified or field-approved is also required to comply with CSA C22.2 No. 0, which stipulates that all markings must be bilingual.

To achieve innovation and sustainability, the electrical industry needs to embrace collaboration as a strategic approach to project delivery.

Let’s take a look at the differences between calculated loads, demand loads, demonstrated loads, and the application of demand factors in the CE Code.