In Canada, which loads of an electrical system in a health care facility are considered to be essential system loads per the CE Code?
In most areas of the country, building construction is booming, and there is a huge need for and use of temporary construction power.
There are no such tests for the NESC‚ because certification as a NESC inspector does not exist. That doesn’t mean there are no qualified NESC inspectors