This article is not comprehensive but rather a guide to assist those who may be new to inspecting medium voltage installations up to 15,000 volts.
Arc-fault circuit interrupters (AFCIs) have become a familiar technology to electrical contractors during the past decade.
This article reviews some of the electrical system grounding requirements as spelled out in the Canadian Electrical Code and it throws in a few curve balls to hopefully keep things interesting.