Inspectors often ask, "What are the procedures for inspecting switchgear?” Like eating an elephant, the best approach is one bite at a time.

In those installations where one or more of these limitations cannot be tolerated, a "full-service” fire pump controller should be used.

In the final installment of this series, we will explore the nuances of developing a continuing education strategy, educational sources that should be pillars of such a strategy and finally, why it’s absolutely necessary for both the good of the individual inspector and the profession as a whole.