Connecting a utility-interactive PV power system can be accomplished on either the supply side or the load side of the facility’s main service disconnect.
By allowing more options, AFCI technology will evolve, adoption will increase, and ultimately people will be safer.
A product that is either factory-certified or field-approved is also required to comply with CSA C22.2 No. 0, which stipulates that all markings must be bilingual.
To achieve innovation and sustainability, the electrical industry needs to embrace collaboration as a strategic approach to project delivery.
Let’s take a look at the differences between calculated loads, demand loads, demonstrated loads, and the application of demand factors in the CE Code.
When a school or part of a school is designated as an emergency shelter, it upgrades the school to a Risk Category IV.
Educational institutions often have the same requirements as most commercial facilities. However, there are a few special requirements that need to be considered.
Ensuring that you have the right physical tools, NEC knowledge, as well as personal safety and intangible tools, are all critical for being the best inspector you can be.
What is the defining difference between an uninterruptible power supply (UPS) and a battery energy storage system (ESS?)












