SUBSCRIBE
PUBLICATIONS
CONTACT
SECTIONS
Electrical Fundamentals
Electrical Inspections
Industry Standards
Electrical Safety
Evolving Technologies
Industry News
COLUMNS
Perspectives on PV
UL Solutions Question Corner
NFPA Code Talk
Canadian Perspectives
Beyond the Service Point
Certification Insights
Code Hunter
Video Library
MAGAZINE
Latest Articles
Article Archive
Subscribe
Author List
Contribute
Advertise
Reprint Permissions
Privacy Statement
Terms and Conditions
CODE ADOPTION
IAEI.ORG
September/October 2009
Connecting the Inverter
NEC-2008 State-by-State Adoption Process raises the Bar
Part III: Transfer Equipment Applications and Considerations
Electrical Workmanship Standards (NEIS) — A Benchmark of Quality
Connecting Premises Wiring to Supply Lines
Where a Successful Installation Begins and Ends: Understanding NEC rules about wire temperature ratings, terminations
Separation of wiring — facts and fiction
Note from the CEO/Executive Director — City of Dallas, Texas, cuts about 36% of building inspection staff
Power Pedestals Listings for Various Locations
Can Power Outlet Listed for Temporary Location be used in Permanent One?
1
2