In this article, we will cover some of Canadian Electrical Code requirements for standby power and transfer switching.
Neon sign transformers differ from most other types of transformers one is likely to encounter.
The excess space inside electrical supply stations (substations) is often considered for storage of construction materials.
This article will focus on grounding and bonding requirements as they relate to metal parts and metal equipment of electric signs and neon installations.
Excerpted from the revised 4th edition of One- and Two-Family Electrical Systems, this article looks at the 1999 Code changes that affect air conditioning and heat pump equipment.