My association leadership philosophy is simple: “Are we providing the members with value-added propositions that promote and enhance their industry?”
Fortunately, some options allow continued safe operation of building department staff while ensuring the safety of installations. No-touch permitting and remote inspections can be used for a broad range of projects.
From code enforcer to code interpreter, problem solver to referee, to public relations representative, it can be challenging to keep track of the many hats electrical inspectors needs to wear!
With options of panelboards, switchboards, and switchgear, the electrical system designer has a robust palette of options to provide the required overcurrent protection for conductors throughout the facility.
Can a panelboard be located “you fill in the blank?” How often have you heard this question? Let’s take a look at some of the rules on panelboard placement contained in the National Electric Code (NEC).
Whole house surge protection devices have been available for several years. The devices are normally installed at the service entrance/service equipment location. They can be sacrificial from large surges, but can also take multiple hits from smaller surges and continue to protect the home and sensitive electronic components. There are various types and designs of surge protective devices (SPD).
To support the ongoing construction of shelter and to maintain existing shelter, we must keep the infrastructure working. We must keep the electricity, gas & water flowing. Grocery stores and fueling stations must be kept open. Inspection by the Building Department is involved at some point for all of these critical functions.
How do we as electrical professionals promote the need for this electrical working space so that panelboards remain readily accessible?
Several different wiring methods may be used to route the power from the PV array to the utilization equipment.