Are Tables 1 and 3 of the CE Code allowed to be used for the determination of ampacities of single conductor cables in underground installations?

EV charging stations, “Charge Points” (after the ChargePoint brand), “Level 1/2/3” Chargers, Superchargers, DC Fast Chargers, CCS Combo Systems, and SAE J1772 Connectors, all refer to Electric Vehicle Supply Equipment or EVSE.

IEEE SA offers the IEEE Distributed Energy Resources (DER) Standards Collection, featuring core IEEE standards that will be pivotal to the energy sector’s transformation using DERs.

In July of 2021, IAEI was excited to partner with Thomas Domitrovich to launch an online series of training videos called #IAEINewsLive

Does UL Certify (List) UVC germicidal products, and is there some guidance on what UL will Certify (List)?

As drilling holes in studs are at the first-laid foundation of your career, Article 300 lies at the very bedrock of the NEC.

I recently compiled ten new questions raised by the readers regarding the use of emergency generators

Starting in this article, we’ll enter the forest and start looking at the individual trees (PV equipment and NEC requirements) in some detail.

The rise of Power Over Ethernet (PoE) technologies and ever-evolving power delivery capabilities have transformed the building environment inside and out over the last two decades.

This is the fifth and final of a series of articles detailing significant changes for the 2021 Canadian Electrical Code Part I (CE Code).